The culvert of highway engineering is generally made of reinforced concrete. Now the use of steel corrugated culvert pipe instead of reinforced concrete culvert construction in China is a new technology, steel corrugated culvert pipe with its stable performance, easy installation, favorable environmental protection, low cost advantages quickly in the highway construction instead of reinforced concrete construction culvert, development prospects are very broad.
1 Before the culvert construction, prepare relevant materials, personnel and equipment to enter the site, and do a good job of safety protection during the construction period, and protect the embankment slope with purse Seine to prevent stones and other objects from sliding down and hurting people.
2 Foundation treatment: It can be backfilled with sand gravel or masonry stone concrete, smooth the base, replace 30-50cm thick gravel material, the density of more than 90%, choose the appropriate water slope about 3%, determine the middle line and side line of each culvert.
3 Corrugated culvert construction, the method of section construction, in advance in the original arch culvert base with two side by side, the length is determined according to the culvert length, as the culvert promotion of the slide rail, corrugated culvert pipe diameter according to the needs of the project can have different specifications, the whole pipe diameter of 0.5m-2.5m, each section length of 3.06 meters, the use of internal (external) flange bolt connection, Assembly pipe diameter is 3m-8m, and the plates are fastened with high-strength bolts.
4 If the culvert length is less than 30 meters, the width of both sides of the corrugated culvert and the original culvert is greater than 80cm, the whole corrugated culvert can be pushed to one end in the downstream or upstream, and after being in place, the masonry of one end of the retaining wall and the backfill work around can be backfilled with sand, gravel, masonry pieces, etc. The top is made of masonry or high pressure pumped expanded cement mortar.
5 If the culvert is larger than 30 meters, the width of both sides of the corrugated culvert and the original culvert is less than 80cm, the 3m-6m long culvert can be pushed to one end in the downstream or upstream, and it can be fixed after being in place, the stone end wall at the top of the corrugated culvert, the distance between the other end of the corrugated culvert and the culvert is blocked by sandbags or mortar pieces, the width is 50cm, and then the backfilling begins. Both sides can be dense sand watertight method or cast concrete vibrator rammed. The expansive cement slurry is pumped at high pressure at the top. After the completion of the filling around the pipe, the second section will be transported to the connection of the two pipes. After the connection is completed, the backfill will be carried out in the same way as above, and the construction of the pipe corrugated culvert will be completed in this order.
1 Steel plate material :Q235 or SS400 hot rolled steel plate
2 Steel plate thickness :2mm-8mm
3 According to the form of assembly: whole type and assembly type
Filling height :1.5-60m
5 Pipe diameter :0.5m-12m
6 Waveform parameters: Wave distance P* Wave depth D (unit mm)
150* 25,200 55,15050,15065,300110,400*180
7 Anti-corrosion treatment: hot dip galvanizing greater than or equal to 84um; Secondary anticorrosion (generally coated asphalt)
8 The service life is greater than or equal to 100 years
9 Implementation standard: According to JTT 791-2010 highway culvert passage for corrugated steel pipe (plate) standard production
10 Pressure level :0.1-6.0mpa
11 Anti-concentrated load N(KGF)100N deformation is not more than 0.2%
12 Resistance to uniform load (KGF), deformation is not more than 0.1D
13 Vertical leakage: no leakage
14 Axially stretched N(KGF) 2450N bellows are not damaged
15 No leakage when the bending test R=300
16 Appearance: Clean appearance, no holes, no cracks, and no trip